# Negotiated procedure without prior publication: grounds, documentation and voluntary ex ante transparency

- URL: https://procurelex.dk/en/guides/negotiated-without-publication
- Updated 2026-11-23
- Reviewed by Mara Ribeiro Duarte (Head of Public Sector at Closer), 2026-11-23
- Legal basis: section 55(vi) of the Public Procurement Act, section 80 of the Public Procurement Act, section 81 of the Public Procurement Act, section 82 of the Public Procurement Act, section 83 of the Public Procurement Act, section 128(1) of the Public Procurement Act, section 129(1) of the Public Procurement Act, section 174(1)(vi) of the Public Procurement Act, section 174(4) of the Public Procurement Act, section 174(5) of the Public Procurement Act

When a contracting authority may award a contract without publishing a contract notice, how the choice is documented, and how voluntary ex ante transparency protects the contract.

The negotiated procedure without prior publication is the procedure in which the contracting authority awards a contract without first publishing a contract notice. It is one of the seven procedures in the Public Procurement Act (udbudsloven) ([section 55(vi) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/55#pp6)) and the only one to which the requirement for a contract notice does not apply ([section 128(1) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/128#p1)). Because competition is wholly or partly set aside, the authority must be able to document that the conditions are met. If it uses the procedure without a basis, the contract may be declared ineffective ([section 17(1)(i) of the Complaints Board Act](https://procurelex.dk/en/klagenaevnsloven/17#p1-p1)).

## Where a procedure has produced no result

The authority may negotiate without prior publication where an open or restricted procedure produced no requests to participate or tenders, or only requests or tenders that are irrelevant to the contract ([section 80(1) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/80#p1)). The conditions are that the fundamental elements of the original procurement documents are not substantially altered and that a report is sent to the European Commission if it so requests ([section 80(2) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/80#p2)). If the fundamental elements have been changed, the condition is not met.

## Only one operator can supply

The authority may also use the procedure where the works, supplies or services can be supplied only by a particular economic operator because ([section 80(3) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/80#p3)):

- the aim is the creation or acquisition of a unique work of art or artistic performance,
- competition is absent for technical reasons, or
- exclusive rights, including intellectual property rights, must be protected.

The last two grounds apply only where there is no reasonable alternative or substitute and the absence of competition is not the result of an artificial narrowing down of the parameters of the procurement ([section 80(4) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/80#p4)). In practice, the authority cannot create the monopoly itself, for example by formulating its needs so that only one supplier fits.

## Unforeseeable urgency

Where compelling urgency results from events the authority could not have foreseen and makes it impossible to comply with the time limits for open procedures, restricted procedures or competitive procedures with negotiation, the authority may use the procedure, but only in so far as strictly necessary ([section 80(5) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/80#p5)). The access is tied to three requirements: the event must have been unforeseeable, it must make the time limits impossible to meet, and the procedure may be used only to the extent strictly necessary.

## Further grounds for supplies, services and works

The Act also lists these cases:

- **Research and development, trial goods** ([section 81(1)(i) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/81#p1-p1)): goods manufactured purely for research, experiment, study or development, but not series production to establish commercial viability or recover development costs.
- **Additional deliveries** ([section 81(1)(ii) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/81#p1-p2)): from the original supplier, where a change of supplier would lead to technical incompatibility or disproportionate technical difficulties. The term may as a rule not exceed 3 years ([section 81(2) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/81#p2)).
- **Commodity exchange** ([section 81(1)(iii) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/81#p1-p3)): goods quoted and bought on a commodity market.
- **Particularly advantageous terms** ([section 81(1)(iv) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/81#p1-p4)): from a supplier definitively winding up its business, or from liquidators in insolvency or similar proceedings. As worded, this ground covers supplies and services.
- **Design contest** ([section 82 of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/82)): a service contract that is a follow-on to a design contest and is awarded to the winner or one of the winners. If there are several winners, all must be invited to the negotiations.
- **Repetition of earlier services** ([section 83 of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/83)): new works or services that repeat similar ones carried out by the operator awarded the original contract, on five conditions: they conform to a basic project; the original contract was awarded under a procedure in accordance with [section 55 of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/55); the original procurement documents state the extent of further works or services and the conditions for award; the possibility is stated in those documents; and no more than 3 years have passed since the original contract was concluded.

## Documentation

After the procurement the authority must draw up a written report which, for this procedure, states the circumstances in [section 80 of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/80)-[section 83 of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/83) that justified using it ([section 174(1)(vi) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/174#p1-p6)). It must document the conduct of the procurement and keep sufficient documentation to justify its decisions ([section 174(4) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/174#p4)), for the duration of the contract and at least 3 years from the award ([section 174(5) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/174#p5)). A contract award notice must be sent no later than 30 days after the contract is concluded ([section 129(1) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/129#p1)). The standstill period does not apply to an award without a prior contract notice ([section 3(3)(i) of the Complaints Board Act](https://procurelex.dk/en/klagenaevnsloven/3#p3-p1)).

## Voluntary ex ante transparency

The authority can ensure that the contract is not declared ineffective under [section 17(1)(i) of the Complaints Board Act](https://procurelex.dk/en/klagenaevnsloven/17#p1-p1) if three conditions are met ([section 4(1) of the Complaints Board Act](https://procurelex.dk/en/klagenaevnsloven/4#p1)):

1. Before concluding the contract, the authority has published in the Official Journal of the European Union a notice stating that it intends to enter into the contract ([section 4(1)(i) of the Complaints Board Act](https://procurelex.dk/en/klagenaevnsloven/4#p1-p1)).
2. The contract is not concluded before 10 calendar days have passed, counted from the day after the notice was published ([section 4(1)(ii) of the Complaints Board Act](https://procurelex.dk/en/klagenaevnsloven/4#p1-p2)).
3. The authority considers that entering into the contract without prior publication of a contract notice is permitted under the Act or the EU procurement rules ([section 4(1)(iii) of the Complaints Board Act](https://procurelex.dk/en/klagenaevnsloven/4#p1-p3)).

The notice must contain the authority's name and contact details, a description of the subject matter, the reasons for awarding without prior publication, and the name and contact details of the undertaking with which it intends to contract ([section 4(2) of the Complaints Board Act](https://procurelex.dk/en/klagenaevnsloven/4#p2)). The provision concerns only protection against a declaration of ineffectiveness. See [remedies](https://procurelex.dk/en/guides/remedies).

## What to watch for

- Each ground must be met on its own conditions. The reasoning should be on file before the contract is concluded.
- Doubt about whether a ground is met can be addressed by voluntary ex ante transparency.
- Later modifications of a contract concluded without a competition follow the rules in [modification of contracts](https://procurelex.dk/en/guides/contract-modification).
