# Technical specifications under the Public Procurement Act: requirements, labels, certification and variants

- URL: https://procurelex.dk/en/guides/technical-specifications
- Updated 2026-11-23
- Reviewed by Mara Ribeiro Duarte (Head of Public Sector at Closer), 2026-11-23
- Legal basis: section 40(1) of the Public Procurement Act, section 40(4) of the Public Procurement Act, section 41(1) of the Public Procurement Act, section 42(1) of the Public Procurement Act, section 42(2) of the Public Procurement Act, section 43 of the Public Procurement Act, section 46(1) of the Public Procurement Act, section 46(3) of the Public Procurement Act, section 47(1) of the Public Procurement Act, section 48 of the Public Procurement Act, section 50(1) of the Public Procurement Act, section 51(1) of the Public Procurement Act

How a contracting authority formulates technical specifications, when it may require labels and certificates, and what applies to variants.

The technical specifications describe what the contracting authority is buying. This is the area where procurements most often become too narrow, because the requirements unintentionally suit one particular supplier or product. The Public Procurement Act (udbudsloven) therefore regulates both how requirements must be formulated and how tenderers may prove that they are met.

## What the specifications must contain

The contracting authority must set out in the procurement documents the technical specifications as defined in point 1 of Annex VII to Directive 2014/24/EU ([section 40(1) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/40#p1)). The specifications lay down the characteristics required of the supply, service or works. The authority may also impose requirements on the specific process or method of production or provision and on intellectual property rights, including their transfer ([section 40(2) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/40#p2)).

For procurement intended for use by natural persons, the specifications must, in principle, take into account accessibility for persons with disabilities or design for all users ([section 40(3) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/40#p3)).

The overriding requirement is that the specifications must afford equal access for economic operators and must not create unjustified obstacles to competition ([section 40(4) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/40#p4)).

## How requirements are formulated

The specifications may be drawn up in three ways ([section 41(1) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/41#p1)), without prejudice to Danish technical rules compatible with EU law which the authority is obliged to apply:

1. **Performance or functional requirements**, provided they are precise enough for candidates and tenderers to determine the subject-matter of the contract ([section 41(1)(i) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/41#p1-p1)).
2. **Reference to standards etc.** in order of preference, each reference accompanied by the words "or equivalent" ([section 41(1)(ii) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/41#p1-p2)). The order is national standards transposing European standards, European technical assessments, common technical specifications, international standards and other technical reference systems of European standardisation bodies, followed by national standards, national technical approvals and national technical specifications. The last three may be used only where the earlier ones do not exist ([section 41(2) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/41#p2)).
3. **A combination** of the two ([section 41(1)(iii) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/41#p1-p3)).

Functional requirements give tenderers the most freedom to propose solutions and are often the best choice because they do not tie the market to one technique.

### Equivalent solutions must be accepted

Where the authority refers to standards, it may not reject a tender because it does not comply with the standard if the tenderer proves by appropriate means that the solution offered satisfies the requirements in an equivalent manner ([section 43 of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/43)). Where the requirements are formulated as performance requirements, a tender complying with one of the listed standards cannot be rejected if the standard addresses the performance requirements ([section 44(1) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/44#p1)). The tenderer must, however, prove that this is the case ([section 44(2) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/44#p2)).

## Brands and trade marks

The authority may not specify a particular make, source or process characterising the products of a specific operator, and may not refer to a particular trade mark, patent, type, origin or production if this favours or eliminates certain operators or supplies ([section 42(1) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/42#p1)).

The exception is exceptional cases where a sufficiently precise and intelligible description is not possible under the rules on drafting ([section 42(2) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/42#p2)). The reference must then be accompanied by "or equivalent".

The authority may refer to product categories where it is clear to tenderers which specific products may be covered ([section 45(1) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/45#p1)), and may evaluate on the basis of a representative sample of comparable products ([section 45(2) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/45#p2)).

## Labels

The authority may require a specific label as evidence of specific characteristics if all these conditions are met ([section 46(1) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/46#p1)):

- the label requirements concern only criteria linked to the subject-matter of the contract ([section 46(1)(i) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/46#p1-p1))
- they are based on objectively verifiable and non-discriminatory criteria ([section 46(1)(ii) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/46#p1-p2))
- the labels are established in an open and transparent procedure ([section 46(1)(iii) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/46#p1-p3))
- the labels are accessible to all potential tenderers ([section 46(1)(iv) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/46#p1-p4))
- the requirements are set by a third party over which the applicant cannot exercise decisive influence ([section 46(1)(v) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/46#p1-p5))

The authority must accept all labels with equivalent requirements ([section 46(3) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/46#p3)), and must always accept other appropriate evidence if the tenderer could not obtain the label in time for reasons not attributable to it, or if the authority can establish that the requirements are met without disproportionate resources ([section 46(4) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/46#p4)).

## Test reports and certification

The authority may require a test report or certificate from a conformity assessment body as evidence of conformity with the technical specifications, award criteria or contract performance conditions ([section 47(1) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/47#p1)). Where documents from a specific body are required, those from equivalent bodies must also be accepted ([section 47(2) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/47#p2)).

Here too there is a duty to accept other appropriate evidence if the tenderer has no access to the required reports or certificates or cannot obtain them in time for reasons not attributable to it, or if the authority can itself establish that the requirements are met without disproportionate resources ([section 48 of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/48)).

## Variants

The authority may accept or require variants. They must be linked to the subject-matter of the contract, and the award criteria chosen must be capable of being applied to both ordinary tenders and variants ([section 50(1) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/50#p1)). This must be stated in the contract notice ([section 50(2) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/50#p2)).

In the procurement documents the authority must state the minimum requirements for variants and any specific requirements, for example that a variant may be submitted only together with an ordinary tender ([section 51(1) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/51#p1)). Only variants meeting the minimum requirements may be taken into account ([section 51(2) of the Public Procurement Act](https://procurelex.dk/en/udbudsloven/51#p2)).

## Practical advice

- Describe the need as a function where possible and use standards as a means of proof rather than the only route.
- Write "or equivalent" at every reference and be ready to assess equivalent solutions.
- Test each requirement: is it necessary, and does it fit only one supplier? Use a [market consultation](https://procurelex.dk/en/guides/market-consultation) if in doubt.
- As a tenderer: ask questions during the tender period if a requirement seems unnecessarily narrow. See the [guide on procurement documents](https://procurelex.dk/en/guides/procurement-documents).