# Public Procurement Act section 46 – Labels

- URL: https://procurelex.dk/en/udbudsloven/46 · Dansk: https://procurelex.dk/da/udbudsloven/46
- Danish Public Procurement Act (udbudsloven) (Consolidated Act No. 116 of 3 February 2025), consolidated version in force from 2025-02-06; official text (prevails): https://www.retsinformation.dk/eli/lta/2025/116
- Procurelex's unofficial English translation, not yet reviewed by a lawyer. Only the Danish text is authentic: https://procurelex.dk/da/udbudsloven/46 · https://www.retsinformation.dk/eli/lta/2025/116

(1) In the technical specifications, the award criteria or the contract performance conditions, a contracting authority may require that a procurement bears a specific label as evidence of specific characteristics, where
   1) the label requirements concern only criteria which are linked to the subject-matter of the contract and are appropriate to define characteristics of the works, supplies or services that are the subject-matter of the contract,
   2) the label requirements are based on objectively verifiable and non-discriminatory criteria,
   3) the labels are established in an open and transparent procedure in which all relevant stakeholders may participate,
   4) the labels are accessible to all potential tenderers, and
   5) the label requirements are set by a third party over which the economic operator applying for the label cannot exercise a decisive influence.
(2) Where a contracting authority does not require that the works, supplies or services meet all of the label requirements, the contracting authority shall indicate the relevant label requirements in the procurement documents.
(3) A contracting authority which requires a specific label shall accept all labels that confirm that the works, supplies or services meet equivalent label requirements.
(4) A contracting authority shall always accept other appropriate means of evidence where
   1) a tenderer demonstrably had no possibility of obtaining the specific label indicated or an equivalent label within the relevant time limit for reasons that are not attributable to that tenderer, or
   2) a tenderer does not hold the required label even though it was possible to obtain it within the relevant time limit, and the contracting authority can establish that the label requirements are met, without the resources which the contracting authority must spend on this, on a case-by-case assessment, disproportionately exceeding the resources which the contracting authority would have to spend on establishing that the tenderer holds the required label.
