Case law

The Complaints Board’s decisions, section by section.

Selected decisions of the Danish Complaints Board for Public Procurement (Klagenævnet for Udbud), ordered by the sections of the Public Procurement Act the Board applied. The summaries are Procurelex’s own and do not replace the decision: follow the link to the full text, in Danish, on the Board’s portal.

100 decisions · Updated 23 November 2026

All decisions, newest first

2026

  • Case 26/07896Partly upheld

    GE Healthcare Danmark A/S v Region Hovedstaden, Region Sjælland, Region Syddanmark, Region Midtjylland og Region Nordjylland

    GE Healthcare challenged the five Danish regions' cancellation of a procurement of framework agreements for ultrasound equipment. The Complaints Board found that the cancellation was not based on irrelevant considerations or contrary to the principles of equal treatment and transparency in section 2, but that the regions had infringed section 171(1), cf. subsection (7), because the cancellation notice referred only to unspecified errors in the procurement documents and so did not allow tenderers to review its lawfulness; the claim to annul the cancellation was rejected.

  • Case 25/11616Upheld

    Globeteam A/S v Kompetencesekretariatet

    Globeteam challenged Kompetencesekretariatet's award of a contract for an IT solution to cBrain. The Complaints Board found that cBrain's tender contained a reservation on data migration, since it made performance conditional on receiving the data in CSV format, that the reservation concerned a fundamental element and that the contracting authority had not shown it could be priced, so the tender should have been rejected under section 159(2) and the principles in section 2; the decision to enter into the contract with cBrain was annulled.

  • Case 26/07460Not upheld

    Vingmed A/S v Region Midtjylland, Region Syddanmark og de tilsluttede kommuner i disse regioner

    The complaint concerned the rejection of Vingmed's tender for a lot of a framework agreement for urology products as non-compliant, after a clarification of the contract term limiting goods originating in China to 50% (the International Procurement Instrument Regulation), and the award to a competitor. The Complaints Board found that Vingmed's confirmation during the clarification under section 159(3) amounted to a reservation, that a later declaration did not oblige the contracting authorities to revoke the award decision under section 170(1), and that the winning tender contained no reservation contrary to section 2.

  • Case 26/04408Not upheld

    Diction Group ApS v Klima-, Energi- og Forsyningsministeriets departement, Energistyrelsen, Geodatastyrelsen, Klimadatastyrelsen, Social- og Boligstyrelsen, Ankestyrelsen, Familieretshuset, Beskæftigelsesministeriets departement, Arbejdstilsynet, Styrelsen for Arbejdsmarked og Rekruttering, Det Nationale Forskningscenter for Arbejdsmiljø og Arbejdsmarkedets hus – Arbejdsretten og Forligsinstitutionen

    Diction challenged the award of a framework agreement for translation and proofreading to AdHoc, arguing among other things that the contracting authorities should have checked AdHoc's compliance with the data protection requirements and whether its tender was abnormally low. The Complaints Board found nothing capable of raising doubt about AdHoc's compliance or suggesting abnormally low prices, so there was no breach of section 159(3) or section 169, and the authorities' answers to questions and the documents' silence on machine translation and AI did not breach the transparency principle in section 2.

  • Case 25/10250Not upheld

    Globus Biler ApS v Silkeborg Kommune

    Globus Biler complained that Silkeborg Kommune had obtained tenders under section 193 for servicing, repairs and tyre changes on the municipality's buses although, in its view, the contract value exceeded the threshold. The Complaints Board found that the municipality had made a documented and objective prior estimate of the contract value under section 30, and dismissed the remaining claims, partly because it has no competence to hear complaints about the award of contracts covered by section 193.

  • Case 25/07026Not upheld

    Lekolar A/S v Staten og Kommunernes Indkøbsservice A/S

    The complaint concerned SKI's rejection of Lekolar's tender for a framework agreement for school, hobby and activity supplies and the award to Creativ Company. The Complaints Board found that Lekolar's tender exceeded the error tolerance in the procurement documents because one product group was offered under two brands, an error that could not be remedied under section 159(5); that the winning tender, on the Board's review, stayed within the tolerance; and that isolated unclear product requirements did not breach section 2.

  • Case 25/08399Not upheld

    HSHansen A/S v Bygningsstyrelsen

    HSHansen challenged Bygningsstyrelsen's award of a design-and-build contract for replacing the façade of the IT University, procured by a competitive procedure with negotiation, arguing that the award criteria were unclear, that the evaluation of quality and organisation was flawed, and that the planning assumptions had been changed during the negotiations. The Complaints Board found that the criteria were sufficiently clear under sections 160 and 164(1), that Bygningsstyrelsen had stayed within its broad discretion in the evaluation, and that it had not been shown that the procurement documents were changed contrary to section 2 and section 66(5).

  • Case 25/04053Not upheld

    twoday Danmark A/S v KL

    twoday challenged KL's award of a contract for an ERP system under SKI's dynamic purchasing system, arguing that the winning tender was non-compliant and abnormally low and, in the alternative, that the procurement documents were unclear about the number of users. Having reviewed the tender, the Complaints Board found that it contained no reservations concerning the requirements relied on, that KL was entitled to rely on the tenderer's information under section 159(2) and (3), that there was no duty to request an explanation under section 169, and that the procurement documents were not unclear contrary to section 2.

  • Case 26/05902Not upheld

    Apovac F.M.B.A. v Region Midtjylland, Region Nordjylland, Region Syddanmark, Region Sjælland og Region Hovedstaden

    The complaint concerned the regions' evaluation of Apovac's tender in a procurement of social and other specific services under Part III of the Public Procurement Act concerning vaccinations by private providers. The Complaints Board found that under sections 186 and 188 the regions had a very wide discretion, that the evaluation followed the method set out in the tender conditions, and that the finding that it was unclear whether replacement staff had been trained did not rest on an incorrect factual basis, so section 2 was not breached.

  • Case 25/12544Not upheld

    Voestalpine Turnout Technology Germany GmbH v Øresundsbro Konsortiet I/S

    Voestalpine claimed that Øresundsbro Konsortiet had not adequately described the evaluation model in a procurement of expansion joints for the Øresund Bridge railway, had evaluated the tenders contrary to it, and had given insufficient notification of the award. The Complaints Board found that the weighting, scoring scale and related deductions from the tender price were set out in the tender conditions as required by section 160, that the evaluation stayed within the contracting authority's discretion, and that the notification with the attached evaluation report met section 171(4)(ii).

  • Case 25/12679Not upheld

    Nordian ApS v Region Hovedstadens Akutberedskab

    Nordian challenged Region Hovedstaden's rejection of its tender for lot 4 of a seated patient transport contract as non-compliant with a seat-height requirement, and the region's technical clarification and physical measurement of a comparable car. The Complaints Board found that the region was entitled to rely on Nordian's own message that its tender was probably non-compliant, despite its later withdrawal, and that under section 159(2), (3) and (5) the region could seek clarification and verify the requirement by measurement without departing from the evaluation model.

  • Case 25/11840Partly upheld

    Viegand Maagøe A/S v Energistyrelsen

    The complaint concerned the Danish Energy Agency's evaluation of VMA's tender in a restricted procedure for a framework agreement on the development and operation of an energy and buildings analysis tool. The Complaints Board found that giving negative weight to VMA not enclosing CVs for all consultant categories breached the principles of equal treatment and transparency in section 2, since the procurement documents set no such requirement, and annulled the award decision; the other objections to the evaluation were not upheld.

  • Case 25/11491Not upheld

    CCL Label A/S v Administrations- og Servicestyrelsen, Skatteforvaltningen

    CCL Label challenged the award of a framework agreement for tobacco tax stamps, arguing among other things that the winning tender should have been rejected as abnormally low or non-compliant. The Complaints Board found that the authority had not in fact rejected CCL Label's tender and had obtained an explanation from the winner in accordance with section 169(1), so there was no basis for setting aside its assessment that the winning tender should not be rejected.

  • Case 25/11755Upheld

    Konsortiet Transition ApS og Boliga ApS v Energistyrelsen

    The consortium complained that it had received only 5 of 8 points on the sub-criterion «Supplier's team» because it had not enclosed CVs for every staff category. The Complaints Board found that a reasonably well-informed tenderer would understand the tender conditions as leaving it to tenderers to choose which CVs (at most seven) to submit; the requirement was therefore not transparent, and the Danish Energy Agency, which bears the risk of ambiguity in the procurement documents, had breached the principle of transparency in section 2.

  • Case 25/11495Not upheld

    Unilyd InStore TV ApS v Varde Kommune

    Unilyd challenged the evaluation of its tender for digital city information screens, including the negative weight given to unclear screen sizes, a 4 cm screen frame and a calendar function not shown at the tender presentation, and the lack of documentation of that presentation. The Complaints Board found that the municipality had not exceeded its discretion in the evaluation, and that e-mails written by its staff immediately after the presentation met the documentation requirement in section 5(3).

  • Case 25/00851Partly upheld

    Arthrex Danmark A/S v Region Midtjylland, Region Syddanmark og Region Sjælland

    The complaint concerned, among other things, a minimum requirement in a joint regional framework agreement for arthroscopy equipment that excluded plastic packaging made of styrene polymers (PS and EPS). The Complaints Board found the requirement objective and proportionate and not an unjustified obstacle to competition under section 40(4), and the place of performance stated in the contract notice compliant with section 128(2), but held that the regions breached section 49(2) by not explaining why lot 2 was not divided further, e.g. geographically; the breach did not lead to annulment, and no financial penalty had been claimed.

  • Case 24/10576Not upheld

    Takeda Pharma A/S v Amgros I/S

    The complaint concerned a framework agreement for collecting plasma from the Danish blood centres and supplying plasma-derived medicines, and challenged a sub-criterion on immunoglobulin yield, the incumbent's competitive advantage and a duration of more than four years. The Complaints Board found that the sub-criterion was linked to the subject-matter of the contract and sufficiently clear, that Amgros had sufficiently neutralised the incumbent's advantage, and that security of supply justified a duration beyond four years under section 95(2).

  • Case 25/04989Upheld

    Prosenso ApS v Region Hovedstaden, Region Sjælland, Region Nordjylland, Region Midtjylland og Region Syddanmark

    Prosenso challenged the award of a lot for nitrile examination gloves to Mediq, whose tender lacked information on chemical substances in an annex that the regions obtained after the time limit for receipt of tenders. The Complaints Board found that information relating to minimum requirement no. 1 could in principle be obtained under section 159(5) but the tender still did not meet the documentation requirement, and that section 159(6) precluded any rectification as regards minimum requirement no. 27; the tender should therefore have been rejected, and the award decision was annulled.

2025

  • Case 24/11995Not upheld

    LOTEK A/S v Forsvarsministeriets Materiel- og Indkøbsstyrelse

    LOTEK challenged a procurement of a framework agreement for firefighters' breathing apparatus, claiming that several minimum requirements were unjustified, unclear or favoured the incumbent supplier, and that the evaluation model was unclear and did not treat tenderers equally. The Complaints Board found the minimum requirements sufficiently clear and objectively justified and not an artificial narrowing of competition under section 2(2), and the evaluation model set out in accordance with section 160 and the principles in section 2.

  • Case 24/03446Not upheld

    Mediq Danmark A/S v Staten og Kommunernes Indkøbsservice A/S

    Mediq complained that SKI had awarded a framework agreement for nursing supplies to Abena although Abena's tender was, in Mediq's view, non-compliant, and that by approving the e-catalogue SKI had accepted changes to fundamental elements of the framework agreement. The Complaints Board found that, although the tender was non-compliant on nine product lines, nothing in it gave SKI reason to doubt its accuracy so as to require further checks under sections 159(3) and 164(2), that setting up the e-catalogue after conclusion of the agreement was not a check of the tender's compliance, and that there was no modification contrary to section 178.

  • Case 25/00927Not upheld

    Jacobs Douwe Egberts DK ApS v Syddansk Universitet

    JDE complained that SDU had rejected its tender for a framework agreement for coffee, tea and machines as non-compliant, and that the evaluation model for the taste test was not transparent. The Complaints Board found that by announcing after the time limit for receipt of tenders that a discontinued product would be replaced, and by bringing a different product to the taste test, JDE had made reservations that were not insignificant, so SDU was entitled to reject the tender without a check under section 164(2), and that the evaluation model for the blind taste test was adequately described and did not breach the principle of transparency.

  • Case 25/06657Dismissed

    City Container Danmark A/S v Gribskov Genbrug & Ressourcer A/S

    City Container challenged Gribskov Genbrug's decision to continue waste collection contracts after the Complaints Board had annulled the award decision and damages had been paid to another tenderer. The Complaints Board found that the decision had been published in the same place as the procurement documents in accordance with section 185(2), so the 20-day time limit for complaints ran from that publication, and dismissed the complaint as lodged too late.

  • Case 25/03606Not upheld

    P. Olesen og Sønner A/S v Bygningsstyrelsen

    P. Olesen challenged Bygningsstyrelsen's evaluation of the sub-criterion 'Time' in a mini-competition for the demolition of mink farm production facilities, and the reasons given for the award decision. The two members of the Complaints Board disagreed, and on the chair's vote the Board found that the assessment of whether the time schedule was realistic fell within the contracting authority's discretion and did not breach the principle of transparency in section 2, and that the notification gave sufficient reasons under section 171(4)(ii).

  • Case 25/06148Not upheld

    CGI Danmark A/S v Erhvervsstyrelsen

    CGI challenged the price evaluation model Erhvervsstyrelsen used in a mini-competition under a framework agreement, arguing that it did not reflect expected costs because the split between on-site and off-site consultants could change during the contract. The Complaints Board found that this possibility did not in itself make the model unsuitable for identifying the most economically advantageous tender under section 161, and that the model was transparent and complied with equal treatment under section 2.

  • Case 24/10982Partly upheld

    Zeppelin Danmark A/S v Forsvarsministeriets Materiel- og Indkøbsstyrelse

    Zeppelin challenged FMI's switch, after an open procedure in which no tenders were received, to a negotiated procedure without prior publication ending in a framework agreement for wheel loaders with Volvo. The Complaints Board found the switch lawful under section 80(1)(i) and the length of the negotiations not disproportionate, but held that FMI had changed fundamental elements contrary to section 80(2) by accepting a model that did not meet the minimum requirements and by changing the price structure; the framework agreement was declared ineffective and a financial penalty imposed.

  • Case 24/06844Not upheld

    SurgiTeam P/S v Region Sjælland

    SurgiTeam complained about Region Sjælland's evaluation of tenders for a framework agreement for locum doctors, procured under the regime for social and other specific services (Part III of the Act), and that the evaluation model was not transparent. The Complaints Board found that the region had not exceeded its broad discretion in the qualitative evaluation of security of supply, and that despite some unclear wording the evaluation model was a relative model, so there was no breach of sections 186 and 188(1) or of the principles in section 2.

  • Case 25/05371Not upheld

    Ketner-Utsch A/S v Skatteforvaltningen v/Motorstyrelsen

    Ketner challenged Motorstyrelsen's use of the competitive procedure with negotiation for a 10-year contract for the production and supply of number plates, its requirement for aluminium plates made from aluminium strip, and the classification of the agreement as a public contract rather than a framework agreement. The Complaints Board found that the conditions of section 61(1)(i)(c) were met, that the requirement was covered by section 42(1)(ii) but justified by the subject-matter of the contract and could therefore be set without the words «or equivalent», and that the agreement was a public contract, not a framework agreement.

  • Case 25/02239Partly upheld

    itm8 A/S v Region Syddanmark

    The complaint concerned Region Syddanmark's evaluation of itm8's tender for a contract on data protection of the region's virtualisation platform. The Complaints Board held that the region breached section 2(1) by evaluating one requirement on the incorrect assumption that itm8's solution depended on the product vSAN, but rejected the other evaluation complaints, found that the reasons given complied with section 171(4)(ii), and declined to annul the award decision given the nature of the breach and the overall result of the evaluation.

  • Case 25/02458Not upheld

    ed A/S v Lejerbo

    ed challenged the evaluation of tenders for a framework agreement for computers and the particular weight given to a user-replaceable USB-C port, which in its view favoured one manufacturer. The Complaints Board found that the evaluation was within the contracting authority's discretion, and that weighting a replaceable USB-C port was neither unjustified nor contrary to section 2 or section 41, as it was only one of several evaluation parameters.

  • Case 24/03872Dismissed

    Dubex A/S v DSB

    Dubex challenged DSB's award of a contract for a managed detection and response service procured under Part IV of the Public Procurement Act (contracts below the thresholds with a clear cross-border interest). The Complaints Board found that the notification stating the points awarded met the lenient requirement of reasons needed to start the 45-day time limit for complaints about sections 191 and 192, since reasons meeting section 171(4) are not required, and that DSB had not revoked the award decision under section 170; the complaint was therefore out of time and was dismissed.

  • Case 24/12196Not upheld

    Røder & Mortensens Eftf. A/S v Københavns Kommune, Økonomiforvaltningen

    Røder & Mortensens challenged Københavns Kommune's rejection of its tender for a framework agreement for electrical installation work because its references did not meet the minimum requirement of one reference worth at least DKK 200,000. The Complaints Board found that compliance with the minimum requirement had not been documented, cf. section 159(2)(ii), that under section 159(5) the municipality was entitled but not obliged to request supplementary information since there was no obvious error, and that the principle of equal treatment prevented the municipality from relying on its own knowledge of the company.

  • Case 24/09713Upheld

    Vognmand Andreas R. Søborg A/S v Odsherred Kommune

    The complaint concerned Odsherred Municipality's rejection of Søborg A/S's tender for the transport of waste from recycling centres for failing a reference requirement on technical ability based on section 155. The Complaints Board found that the requirement's alternative for new operators was unclear and could be read as covering any operator without previous experience in waste transport, and that by rejecting the tender without assessing whether Søborg A/S had otherwise shown relevant experience, the municipality breached section 2.

  • Case 24/03756Not upheld

    Kongsvang Cleaning & Facility A/S v Jammerbugt Kommune

    The complaint concerned the evaluation model for the sub-criterion «Ydelsesberegning» (service calculation) in a cleaning procurement and the municipality's acceptance of the winning tenderer's evidence of reliability. The Complaints Board found that the model had not in fact been unsuitable to identify the most economically advantageous tender, and that a disputed damages claim pending in arbitration did not mean that the tenderer had been ordered to pay damages under section 138(3)(i), so the municipality had not breached section 159(2) and (3) or section 2.

  • Case 23/12704Not upheld

    Würth Danmark A/S v Forsvarsministeriets Materiel- og Indkøbsstyrelse

    Würth complained that FMI, after an open procedure for a framework agreement for hand tools and similar products, had switched to a competitive procedure with negotiation, and about the evaluation of the winning tender from Lemvigh-Müller and the reasons given for the award decision. The Complaints Board found that all tenders in the open procedure were irregular, so the switch was lawful under section 61(1)(ii), cf. subsection (2)(i), that the errors FMI should have priced into the winning tender would only have caused an insignificant drop in points, and that the notification met section 171, since under section 172 FMI did not have to disclose points per product line.

2024

  • Case 23/12520Not upheld

    Biogen (Denmark) A/S v Amgros I/S

    Biogen complained that Amgros had awarded Sandoz first priority under a framework agreement for the medicine dimethyl fumarate although, in Biogen's view, Sandoz's supplies would infringe Biogen's patent rights and regulatory data and marketing protection, and that Amgros had not enforced the framework agreement. The Complaints Board found that when the contract was concluded there was no certainty or high probability that Sandoz could not supply, so Amgros was not required to reject the tender under sections 2 and 159(2) and (3), and that Amgros had not modified essential elements of the framework agreement in breach of section 178(1).

  • Case 24/06147Partly upheld

    Cura Pleje ApS v Frederiksberg Kommune

    The complaint concerned Frederiksberg Kommune's evaluation of tenders and discrepancies between the contract notice and the tender conditions in a procurement of home-care framework agreements under the regime for social and other specific services. The Complaints Board found no basis to set aside the qualitative evaluation, but held that the municipality breached the principle of transparency in section 2 and section 187(2) by stating a different minimum turnover requirement in the notice than in the tender conditions and by marking the selection criteria as «not used» in the notice, and annulled the award decision.

  • Case 24/03766Not upheld

    Scania Danmark A/S v I/S REFA

    Scania complained that REFA had not terminated its contract with Ejner Hessel after the Complaints Board had annulled the award decision. The Board found that the annulment only became final when the time limit for bringing the case before the courts expired on 10 April 2024, so the 7-day time limit in section 185(2) had not yet expired when the complaint was lodged, and since REFA terminated the contract on 30 April 2024 there was no breach; the claim for an order to terminate was dismissed as no longer relevant.

  • Case 24/01827Partly upheld

    Bruker Nordic AB v Syddansk Universitet

    Bruker Nordic complained that, after an open procedure, SDU moved to a competitive procedure with negotiation without a new contract notice and awarded the contract to MR Solutions, which had been allowed after the time limit to rely on the financial capacity of a group company. The Complaints Board found that SDU had thereby allowed a new tender, contrary to section 2 and section 159(5), and that, as MR Solutions did not meet the suitability requirements, SDU was not entitled to include it in the procedure under section 61(4); the award decision was annulled, but the contract was not declared ineffective because a contract notice had been published for the preceding open procedure.

  • Case 24/02979Partly upheld

    Sunrise Medical ApS v Fællesudbud Sjælland v/Holbæk Kommune

    Sunrise Medical challenged a framework agreement procurement for wheelchairs and the evaluation of its tender. The Complaints Board found that several minimum requirements were so discretionary that they were unsuitable as minimum requirements, breaching the transparency principle in section 2, and that the evaluation had taken into account experience with products other than the one tendered; as this could have decided the outcome, the award decision was annulled, while the challenge to the evaluation model under section 160 failed.

  • Case 24/08376Upheld

    Verdis A/S v Gribskov Genbrug & Ressourcer A/S

    The complaint concerned whether discounts offered for both lots had to be taken into account in the evaluation in a procurement of household waste collection. The Complaints Board found that «overall» in the tender conditions referred to both lots together, so that by awarding both lots to another tenderer the contracting authority had not evaluated in accordance with the tender conditions, in breach of sections 2 and 160, and annulled the award decision.

  • Case 23/07577Partly upheld

    DriveClever A/S v Københavns Kommune

    DriveClever challenged the evaluation method Københavns Kommune used in a procurement of a framework agreement for vehicle maintenance based on a product range. The Complaints Board found that the municipality had not shown that the prices evaluated for one model per brand were representative of the brand's other models, so the evaluation was not based on a representative sample under section 45(2); the award decision was annulled, but the claim to order termination of the contract was dismissed because that obligation follows directly from section 185(2).

  • Case 23/13174Partly upheld

    Silkeborg Jordemoderhus ApS v Region Syddanmark

    The complaint concerned Region Syddanmark's cancellation of a procurement under Part III of the Act for a private maternity clinic, in which the complainant was the only tenderer, and the conduct of the negotiations. The Complaints Board found that the cancellation was objectively justified, as only one tender had been received and it did not meet the region's expectations, but that the region breached the principle of transparency in section 2, which under section 186 also applies to social and other specific services, by negotiating on final tenders in several rounds contrary to the tender conditions.

  • Case 24/04217Not upheld

    KPMG P/S v Finansministeriet

    KPMG challenged Finansministeriet's (the Ministry of Finance's) rejection of its tenders for a framework agreement for financial advisory services as non-compliant. The Complaints Board found that KPMG's daily prices, based on a 7.5-hour working day instead of the required 24-hour day, amounted to a reservation concerning a fundamental element, and that the Ministry could not have asked KPMG to clarify the price under section 159(5) without breaching section 2, since this would have given KPMG a competitive advantage.

  • Case 23/12074Partly upheld

    Nuuday A/S v Staten og Kommunernes Indkøbsservice A/S

    Nuuday complained that, after a restricted procedure for a framework agreement on communication products, SKI had switched to a competitive procedure with negotiation although, in Nuuday's view, its first tenders were compliant. The Complaints Board found that the tender conditions' error margin of up to two per cent covered Nuuday's errors, so SKI had not shown that the conditions in section 61(1)(ii) were met and the switch breached section 2, and it annulled the award decisions; the claim for ineffectiveness was rejected because, in a change of its practice, the Board held that a contract awarded after a procedure under section 61(1)(ii), cf. subsection (4), is not a direct award.

  • Case 23/05915Partly upheld

    Acapulka AS v Forsvarsministeriets Materiel- og Indkøbsstyrelse

    Acapulka complained that FMI had bought sledges (pulks) directly from another supplier without any procurement procedure. The Complaints Board found that the purchase was not covered by the defence and security directive, that the conditions for extreme urgency in section 80(5) were not met, and that the contract was below the threshold in section 6(2) but of clear cross-border interest, so FMI had breached section 2 read with section 191(1) and section 192(1) and (2); the decision to conclude the contract was annulled.

  • Case 22/14569Partly upheld

    SundVikar A/S v Fællesindkøb Fyn v/Faaborg-Midtfyn Kommune

    SundVikar complained that Fællesindkøb Fyn had concluded a temporary framework agreement for temporary staffing services with Carelink without prior publication of a contract notice after SKI had terminated its framework agreement with SundVikar. The Complaints Board found that the conditions of section 187(5), cf. section 80(5), were not met, since the termination was not unforeseeable and extreme urgency had not been shown; as the framework agreement had expired, it could not be declared ineffective, and a financial penalty of DKK 400,000 was imposed instead.

  • Case 23/04348Not upheld

    Hareskov Elektric A/S v Københavns Kommune

    Hareskov Elektric challenged Københavns Kommune's award of a framework agreement for lighting renovation after the municipality had revoked its first award decision because of an error in the price calculation and, in the renewed evaluation, scored the complainant's CVs lower. The Complaints Board found that under section 170(2) the municipality had to carry out a fresh assessment and was obliged to correct other errors in the first evaluation as well (scores in decimals and positive weight given to a minimum requirement), and that it had shown that it had not changed its weighting contrary to the principle of transparency; the other claims were rejected or dismissed.

  • Case 22/14561Not upheld

    DiaLab, Dansk Diagnostika- og Laboratorieforening v Region Midtjylland

    The complaint concerned Region Midtjylland's direct award of contracts for antigen self-tests in 2021 during the COVID-19 epidemic on the basis of section 80(5). The Complaints Board found that the region had shown that the cumulative conditions were met: the need was unforeseeable, extreme urgency made it impossible to make the purchases through a procedure under section 55, including an accelerated procedure, or through the dynamic purchasing system, there was a causal link, and the purchases were limited to what was strictly necessary.

  • Case 24/01634Partly upheld

    Otis A/S v Staten og Kommunernes Indkøbsservice A/S

    Otis complained that SKI, when publishing questions and answers in the procurement of a framework agreement for servicing, repair and inspection of elevators, had not anonymised a question asked by Otis. The Complaints Board found that this breached the tender conditions and thereby the principles of equal treatment and transparency in section 2, but since Otis had not shown that the breach had a specific and material effect on the course and outcome of the procurement, the award decisions were not annulled.

  • Case 23/02387Upheld

    Jensen Denmark A/S v Region Sjælland

    Jensen Denmark challenged Region Sjælland's competitive procedure with negotiation for the machinery contract for a new hospital laundry, including a secondary scoring model allowing the region to adjust the slope of the price evaluation if tenders were «inappropriately» distributed. The Complaints Board found that it had not been unambiguously laid down in advance how the slope would depend on the tenders received, giving the region freedom of choice contrary to section 160 and section 2; the region had also admitted breaches of section 53 on parallel tenders and of section 171(4), and the award decision was annulled.

  • Case 23/07970Upheld

    Powercare A/S v Region Hovedstaden

    Powercare complained that, in a procurement under Part III (social and other specific services) of framework agreements for temporary healthcare staff, Region Hovedstaden had changed the minimum requirement on references for technical and professional ability by a corrigendum notice. The Complaints Board found that section 2 applies through section 186, that changing a minimum requirement of suitability is as a starting point a modification of an essential element, and that the region had not proved that the change could not have affected participation, so the award decision was annulled.

2023

  • Case 23/03579Upheld

    Assemble A/S v Hørsholm Kommune

    The complaint concerned Hørsholm Municipality's change of two minimum requirements after the negotiation meetings in a competitive procedure with negotiation for a day-care place allocation system. The Complaints Board found that the municipality had not shown that the changes, made at the winning tenderer's request, could not have affected participation or distorted competition, and that it had therefore changed basic elements contrary to section 66(5) and the principle of equal treatment in section 2.

  • Case 23/08841Not upheld

    Capgemini Danmark A/S v Skatteministeriet v/Udviklings- og Forenklingsstyrelsen

    Capgemini complained about the quality evaluation in a mini-competition under a framework agreement for IT development services and about the reasons given in the notification of the award decision. The Complaints Board found that the matters the agency had weighed, including sector insight and the composition of the team, fell within what the procurement documents described, cf. section 160(1), and that the notification sufficiently stated the characteristics and relative advantages of the tenders under section 171(4)(ii).

  • Case 22/14549Partly upheld

    Konsortiet Abena A/S og Coloplast Danmark A/S v Esbjerg Kommune, Middelfart Kommune, Vejle Kommune, Herning Kommune, Fanø Kommune, Vejen Kommune, Varde Kommune og Billund Kommune

    The consortium challenged the municipalities' procurement of a framework agreement for ostomy products. The Complaints Board found that the agreement was for pecuniary interest and thus a public contract subject to procurement under section 24(xxiv), and that the municipalities had breached section 2 by not stating a maximum quantity or value for the framework agreement and by capitalising errors in the price lists contrary to the procurement documents; the claims concerning grounds for exclusion, the quality evaluation and unclear requirements were rejected, and the award decision was annulled.

  • Case 23/06161Partly upheld

    EG Danmark A/S v Frederikshavn Kommune

    EG complained about the evaluation model, minimum requirements, the use of tender presentations and demonstrations, the negotiation process and the reasons in the notification in Frederikshavn Kommune's competitive procedure with negotiation for an enterprise system. The municipality had acknowledged that its notification did not give adequate reasons, including the winning tenderer's price, and the Complaints Board found a breach of section 171(4)(ii) and section 2, but rejected the other claims, including the claim for annulment.

  • Case 23/07108Not upheld

    Oshkosh Airport Products, United States of America v Forsvarsministeriets Materiel- og Indkøbsstyrelse

    Oshkosh Airport Products, which did not submit a tender, challenged several technical specifications in Forsvarsministeriets Materiel- og Indkøbsstyrelse's open procedure for crash tenders for military airports, including requirements on width, height, engine and brakes, as well as the time limit for receipt of tenders. The Complaints Board found that the requirements were objectively justified by the contracting authority's needs within its wide discretion under section 40(4) and section 2, and that the time limit complied with the minimum time limit in section 57.

  • Case 22/14568Partly upheld

    Scania Danmark A/S v I/S REFA

    Scania challenged REFA's award of a contract for the supply and servicing of refuse collection vehicles to Hessel. The Complaints Board found that REFA had not verified before the award that Hessel met the minimum requirement of suitability of four references, contrary to section 159(2), and that Hessel's tender contained a reservation against the minimum requirement for LED lighting, so it should not have been considered under the principles in section 2; the award decision was annulled, while a claim about the number of vehicles stated in the tender failed.

  • Case 23/00727Upheld

    De Forenede Dampvaskerier A/S v Odense Kommune

    DFD challenged Odense Kommune's award of a contract for the washing and rental of cloths and mops. As the municipality admitted that it had infringed section 2(1), section 161 and section 162(1) by awarding the contract to a tenderer that had not submitted the most economically advantageous tender on the basis of the award criterion laid down, and by setting unclear conditions for the basis of tendering, the Complaints Board upheld the claims and annulled the award decision.

  • Case 22/14583Not upheld

    Roche Diagnostics A/S v Region Sjælland

    The complaint concerned whether Region Sjælland should have rejected the winning tender for analytical equipment for failing a minimum requirement on water systems, whether that requirement was unclear, and whether the tender was abnormally low. The Complaints Board found that the tender met the clearly worded minimum requirement and that a price about 41-44% below the other tenders did not in itself justify setting aside the region's assessment under section 169(1) that the tender did not appear abnormally low.

  • Case 22/14554Not upheld

    Yunex GmbH v Sund & Bælt Holding A/S

    Yunex complained that it had not been shortlisted in Sund & Bælt's competitive procedure with negotiation for a kilometre-based road charging enforcement system, and challenged the reasons given and the selection of a competing candidate. For the reasons given in its ruling on suspensive effect, the Complaints Board found that Sund & Bælt had not exceeded its discretion, that the reasons met section 171(2), that it could rely on the competitor's references under section 145(2), and that missing signatures on ESPDs could be rectified under section 159(5); the claims seeking effective verification and an order to invite Yunex to tender were dismissed.

  • Case 22/14548Partly upheld

    Oluf Brønnum & Co. A/S v Region Hovedstaden

    The complaint concerned Region Hovedstaden's evaluation model and evaluation in a competitive procedure with negotiation for a distribution, dishwashing and service handling system at Rigshospitalet. The Complaints Board found that the model breached section 160 because it was unclear with what weight an item for the contracting authority's estimated costs counted in the sub-criterion «Price», and that the region breached section 2 by not awarding points as the model described; the winning tender was not non-compliant, and the award decision was annulled because it could not be ruled out that the error in the price model had affected the outcome.

  • Case 22/14542Not upheld

    Globeteam A/S v Økonomistyrelsen

    Globeteam complained that Økonomistyrelsen had awarded a contract for a single sign-on solution to Netcompany without examining further whether the offered Keycloak-based solution really was a standard product meeting the minimum requirements. The Complaints Board found that the tender, on its content, met the requirements, and that Globeteam's objections, together with Netcompany's confirmation, did not create such doubt that the authority was obliged to carry out further checks under sections 159(3) and 164(2).

  • Case 22/14556Upheld

    Intervare A/S v Køge Kommune

    Intervare complained that Køge Kommune had concluded contracts for home delivery of groceries to eligible citizens without publishing a contract notice. The Complaints Board found that these were public contracts under section 24(xxiv) and that the municipality's estimate of their value under sections 29 and 30 rested on a wrong delivery frequency and on historical prices alone, so it had not shown that the threshold in section 7 was not reached; the contracts were declared ineffective from 1 August 2023 and a financial penalty of DKK 135,000 was imposed.

  • Case 22/14577Partly upheld

    Dustin A/S v Staten og Kommunernes Indkøbsservice A/S

    Dustin challenged several aspects of SKI's procurement of a framework agreement for computers, including an extension of the time limit, modifications of the procurement documents, references to specific makes and the award to Comm2IG. The Complaints Board found that SKI breached section 2 by sending the notice extending the time limit to the EU Publications Office only after the time limit had expired and, by a majority, by awarding both lots to Comm2IG without the check described in the tender conditions although its tenders were non-compliant, and annulled the award decision, while the claims concerning modifications of the procurement documents (sections 93 and 134) and section 42 were rejected.

  • Case 22/17491Not upheld

    Filial af Trend Micro Emea Limited v Region Hovedstaden

    The complaint concerned technical specifications in Region Hovedstaden's purchase of endpoint protection software under SKI's dynamic purchasing system, requiring compatibility with the region's existing firewalls and sandbox solution. The Complaints Board was divided: the chair found the requirements objectively justified and proportionate under section 40(1) and (4) and section 2, while the other member found that the region had not discharged its burden of proof; the chair's casting vote decided, and the complaint was not upheld.

  • Case 23/03361 og 23/03362Partly upheld

    Meldgaard Miljø A/S v Afatek A/S

    The complaint concerned Afatek's repeated use of the accelerated procedure with a 15-day time limit for receipt of tenders in two open procedures for the disposal of incineration slag, citing limited storage space. The Complaints Board found that the accelerated procedure had been used without justification under section 57(5), that shortening the time limit to 15 days without reasons and the short time limit for evidence of the ESPD information breached section 2, and that the contract notice, contrary to section 2, section 128(2) and section 140(2), did not describe the grounds for exclusion and the suitability criteria; the claim for annulment was not upheld.

  • Case 22/14559Not upheld

    Siemens Healthcare A/S v Region Sjælland

    Siemens complained about Region Sjælland's procurement of laboratory equipment and analysis results, including the handling of a formula error in the price list, a postponed site visit, the winning tenderer Abbott's hiring of a former employee of the region, and Abbott's low price. The Complaints Board found no competitive advantage requiring rejection under section 136(i) and section 2, no basis for overriding the region's assessment that Abbott's tender did not appear abnormally low under section 169(1) and (2), and no other breach.

  • Case 22/14580Partly upheld

    Mediq Danmark A/S v Høje-Taastrup Kommune, Brøndby Kommune, Køge Kommune og Odsherred Kommune

    The complaint concerned four municipalities' joint procurement of a framework agreement for clinical nutrition and utensils. The Complaints Board found that the municipalities breached the principles of equal treatment and transparency in section 2 because the contract notice referred to one framework agreement while the procurement documents provided for four, and annulled the award decision; the description by product categories under section 45(1), the evaluation model based on a basket of goods under section 45(2) and section 160(1), and the listing of historical consumption under section 42(1) were lawful.

  • Case 22/14565Partly upheld

    Winncare Nordic ApS v Aarhus Kommune

    Winncare challenged Aarhus Kommune's evaluation of samples in a framework agreement procurement for shower-toilet chairs and its refusal to let tenderers remedy defects. The Complaints Board found that the description of the evaluation met section 160 and that there was no duty under section 159(5) to let tenderers supplement their tenders, but that the municipality breached equal treatment under section 2(1) by letting one tenderer collect its sample early while refusing another; the breach had no effect on the award and did not lead to annulment.

2022

  • Case 22/14585Upheld

    Tunstall A/S v Frederikssund Kommune

    The complaint concerned Frederikssund Kommune's award, without prior procurement, of a contract for an emergency call system on the basis of an unsolicited offer just below the threshold, after the municipality had split an originally combined purchase. The Complaints Board held that the value was to be estimated when the municipality launched the procedure (section 29), that it was above the threshold, and that the municipality had not shown that the split was objectively justified under section 30(2), and annulled the award decision.

  • Case 21/10951Not upheld

    ATKI A/S v Odense Kommune

    ATKI challenged Odense Kommune's award of a contract for the operation and maintenance of traffic signals to the incumbent, Swarco, arguing that Swarco's tender was abnormally low, that Swarco had competitive advantages, and that a value-preservation sheet was not transparent. Relying on its earlier ruling on suspensive effect, the Complaints Board found that the municipality had not exceeded its discretion in assessing the tender price, that the tenderers had been treated equally, and that the sheet was not used in the evaluation, so sections 2, 160, 162 and 164 had not been breached.

  • Case 21/05033Partly upheld

    JK Office ApS v Skive Kommune

    JK Office complained about Skive Municipality's award of a framework agreement for office furniture, claiming among other things that the winning tender was non-compliant, that the minimum requirements and the evaluation model were unclear, and that the reasons for the award decision were inadequate. The Complaints Board found the winning tender compliant, the minimum requirements clear and the evaluation adequately described under section 160, but, the municipality having admitted it, found that the reasons given breached sections 171 and 2; this alone did not justify annulment.

  • Case 22/04951Partly upheld

    Filial af Trend Micro Emea Limited v Region Hovedstaden

    Trend Micro challenged Region Hovedstaden's cancellation of a mini-competition under an SKI framework agreement for antivirus licences and the direct award of the contract to Atea the following day. The Complaints Board found that the cancellation was justified, but that the direct award had not been made on the basis of the framework agreement and breached section 2 and section 99; as the region had not shown that splitting the purchase was objectively justified under section 30(2) or that its value was below the threshold in section 6(1)(iii), the contract fell under Part II and was declared ineffective from 25 January 2023, together with a financial penalty.

  • Case 22/06575Partly upheld

    Electrolux Professional A/S v Alabu Bolig

    Electrolux complained that Alabu Bolig had awarded 18 contracts for operating laundries directly to Nortec without a procurement procedure. The Complaints Board found that the housing departments were separate operational units under section 31(2), so the contract values were not to be aggregated, but that three contracts each exceeding the threshold in section 6(1)(iii) had been awarded without a contract notice in breach of section 2, as Alabu had admitted; those three decisions were annulled and the contracts declared ineffective.

  • Case 21/10232Partly upheld

    Inlead ApS v Det Digitale Folkebibliotek

    Inlead complained that Det Digitale Folkebibliotek, after publishing a voluntary ex ante transparency notice, had directly awarded Reload a contract for developing a base platform. The Complaints Board found that the contract, as part of a larger project, fell under Part II and that DDF had not proved that the conditions of section 80(3)(ii) (absence of competition for technical reasons) were met, in breach of sections 2 and 6, cf. section 128(1), and annulled the award decision; since DDF had exercised due diligence, the contract was not declared ineffective.

  • Case 22/03178Not upheld

    Atea A/S v Udenrigsministeriet

    Atea complained again about the Ministry of Foreign Affairs after an earlier ruling that the winner of a framework agreement did not meet a minimum requirement for certification, arguing that the ministry had waived the requirement and thus modified the framework agreement contrary to section 2(1) and section 178. The Complaints Board found that the ministry had enforced the requirement immediately after the earlier ruling and that the supplier had obtained the certifications within a reasonable time; the claim for annulment of the award decision was dismissed as out of time.

  • Case 21/10894Partly upheld

    Atea A/S v Region Sjælland

    The complaint concerned a framework agreement for an indoor mobile coverage system (DAS) for Region Sjælland's hospitals, where the drawings provided were not accurate. The Complaints Board held that the region breached section 2(1) by not neutralising the incumbent's competitive advantage as far as possible and by not publishing an extension of the time limit as a corrigendum to the contract notice, but rejected the claims on a change of fundamental elements and an insufficient extension of the time limit under section 93(4); it annulled the award decision.

  • Case 22/01867Partly upheld

    Netcompany A/S v Arbejdstilsynet

    The complaint concerned Arbejdstilsynet's evaluation in a procurement of a framework agreement for development, maintenance and operation of its case-management systems. The Complaints Board held that the price evaluation model did not reflect the expected purchases and was therefore unsuitable to identify the most economically advantageous tender (sections 161 and 2), and that costing the winning tenderer's proposed solution on the basis of another tenderer's estimate was manifestly unreasonable, while rejecting the claims on the qualitative evaluation, the maximum value of the framework agreement and a reservation; it annulled the award decision.

  • Case 21/05648Not upheld

    Fugato A/S v Bornholms Regionskommune, Bornholms Affaldsbehandling

    Fugato challenged BOFA's evaluation of tenders for a waste collection contract on Bornholm and BOFA's request, after pricing reservations in the winning tender, that the winning tenderer clarify certain errors. The Complaints Board found that the evaluation stayed within the tender conditions and the contracting authority's discretion, and that the request did not allow the tenderer to improve its tender but concerned obvious errors that could be clarified under section 159(5), with no breach of section 2.

  • Case 21/13160Upheld

    Peab Asfalt A/S v Øresundsbro Konsortiet I/S

    Peab complained that Øresundsbro Konsortiet had not stated the estimated quantity or value of the services to be provided in the contract notice for a framework agreement for paving works. Referring to the Court of Justice's judgment in Case C-23/20, the Complaints Board found that the requirement also applies to services and that the consortium had breached sections 56 and 128(2) and section 2; it annulled the award decision and stated that there were no special circumstances justifying continuation of the contract under section 185(2).

  • Case 21/07625Not upheld

    Koss ApS v Indkøbsfællesskabet IFIRS

    Koss challenged IFIRS' open procedure for a framework agreement for teaching materials for hairdressing training, including the handling of samples, alleged ambiguities in the procurement documents on course prices and the term «tender sum», and IFIRS' failure to answer a question asked after the time limit for additional information. The Complaints Board found that the procurement documents were sufficiently clear, that IFIRS was not obliged to provide additional information after the time limit where the information appeared from the procurement documents, and that the principles of equal treatment and transparency in section 2 had not been breached.

  • Case 22/03802Not upheld

    Dorte Mandrup A/S v Aarhus Kommune

    The complaint concerned Aarhus Kommune's rejection of an entry in a design contest for a new stadium because an A3 folder and an IFC file had not been uploaded by the deadline. The Complaints Board found that the municipality was not obliged to reject the entry under section 159(6), since the procurement documents did not expressly require rejection, and could have requested the documents under section 159(5), but that it was entitled to reject the entry, so the rejection did not breach section 2(1).

  • Case 21/02695, 21/02964 og 21/02965Partly upheld

    Albertslund Tømrer og Snedker A/S, VVS & Varmeteknik A/S og HRH EL A/S v Albertslund Kommune

    Three craft firms that had not been selected challenged Albertslund Kommune's use of the competitive procedure with negotiation for framework agreements for craft services. By a majority, the Complaints Board found that the municipality had not shown that the conditions of section 61(1)(i)(a) and (d) were met, since the services were ordinary standard services, and annulled the award decisions for the lots the complainants had applied for; the claims concerning minimum requirements, ineffectiveness and a financial penalty were not upheld.

  • Case 20/14737Partly upheld

    Atea A/S v Udenrigsministeriet

    The complaint concerned the Ministry of Foreign Affairs' award of a framework agreement for cabling and access security to a tenderer that did not itself meet a minimum certification requirement. The Complaints Board held that the requirement clearly applied to the supplier itself and could not be met through subcontractors, so the ministry breached section 2(1) by not rejecting the tender, but found that the requirement had not been waived contrary to section 178 and that there was no basis for declaring the contract ineffective; annulment had not been claimed.

  • Case 20/13387Not upheld

    Tunstall A/S v Region Nordjylland, Nyt Aalborg Universitetshospital

    Tunstall challenged Region Nordjylland's award of a low-voltage works contract for patient call, cardiac arrest alarm and bedside terminal systems at the new Aalborg University Hospital, arguing that the evaluation was flawed and favoured the winning tenderer, that the criteria were not transparent, and that the preliminary market consultation had given others a competitive advantage. The Complaints Board found that the region had evaluated within its discretion and could mark down ambiguities in Tunstall's tender without having to seek clarification under section 159(5), that the minimum requirement of 'current models' was clear, that there was no duty of effective verification under section 159(3) and section 164(2), and that the market consultation did not breach section 2 and section 39.

2021

  • Case 21/01896Partly upheld

    MAN Truck & Bus Danmark A/S v Region Midtjylland, Region Hovedstaden, Region Nordjylland og Region Sjælland

    MAN Truck complained that the regions had rejected its tender for a framework agreement on ambulance vehicles as non-compliant and awarded it to Skandinavisk Motor Co. The Complaints Board found that MAN Truck's tender had rightly been rejected, but that Skandinavisk Motor Co.'s tender contained a reservation against the minimum requirement of active air suspension, so the regions had breached section 2 by awarding the contract to a non-compliant tender, and the award decision was annulled.

  • Case 21/07807Upheld

    Attendo A/S v Greve Kommune

    Attendo challenged Greve Kommune's Part III procurement for the operation of a care home, in which the procurement documents gave information on the incumbent's staff to be taken over under the Danish transfer-of-undertakings legislation. The Complaints Board found that the information was incorrect and misleading because hourly-paid staff were not included, that the municipality's later clarification changed a fundamental element contrary to section 2, and that the award decision did not meet the requirement to give reasons in section 188(2), cf. section 171(4); the award decision was annulled.

  • Case 19/06361Upheld

    Simonsen & Weel A/S v Region Nordjylland og Region Syddanmark

    Simonsen & Weel complained that the regions had stated neither the estimated quantity or value of the tube-feeding products to be supplied under a framework agreement in the contract notice, nor a maximum quantity or value in the procurement documents. Following the Court of Justice's answer to the Board's preliminary reference (Case C-23/20), the Complaints Board found breaches of sections 56 and 128(2) and section 2, annulled the award decision and stated that there were no special circumstances justifying continuation of the framework agreement under section 185(2).

  • Case 20/14886Partly upheld

    PricewaterhouseCoopers Statsautoriseret Revisionspartnerselskab v Rigspolitiet

    PWC challenged Rigspolitiet's evaluation of its tender in a competitive procedure with negotiation for an IAM system for the police, and the absence from the contract notice of a description of the negotiation process and of any payment to participants. The Complaints Board found that the evaluation was flawed on certain points contrary to section 2, but not to an extent that justified annulment, and that Rigspolitiet had not breached section 62(2).

  • Case 21/03987Not upheld

    HydroCharting ApS v Forsvarsministeriets Materiel- og Indkøbsstyrelse

    HydroCharting complained that Forsvarsministeriets Materiel- og Indkøbsstyrelse (FMI) had rejected its tender for software for cleaning sonar data as non-compliant. The Complaints Board found that, despite its low value, the contract had a clear cross-border interest and so fell under Part IV, cf. section 191(1), so the complaint was not dismissed, but that the tender did not meet the minimum requirement of reading and writing directly to and from NaviEdit and had rightly been rejected.

  • Case 21/02167Upheld

    Fineman A/S v Region Hovedstaden

    The complaint concerned Region Hovedstaden's answer to a question in a procurement of face masks for an EU emergency stockpile, which reduced the turnover requirement proportionately for newly established companies. The Complaints Board found that the region had thereby changed basic elements during the tender phase, namely the minimum requirements of economic and financial standing, contrary to section 2(1), and annulled the award decision because the region had not shown that the change did not affect which companies submitted tenders.

  • Case 21/02013Upheld

    DXC Technology Danmark A/S v Domstolsstyrelsen v/Tinglysningsretten

    DXC complained about the price evaluation in Domstolsstyrelsen's procurement of the operation, maintenance, support and further development of the digital land registration system. The Complaints Board found that the evaluation model, which counted operation, maintenance and support fees both at the full price and under an option for software cheaper than Oracle, made it unclear what was being purchased and did not reflect the expected purchase, in breach of section 160(1) and section 2, and annulled the award decision.

  • Case 21/05162Not upheld

    SZCZĘŚNIAK Special Vehicles Ltd. v Aarhus Kommune, Teknik og Miljø, Østjyllands Brandvæsen I/S, Interessentskabet Brand & Redning Midtvest, Beredskab & Sikkerhed – Randers Favrskov Djursland I/S, Midtjysk Brand & Redning I/S, Trekantområdets Brandvæsen I/S, Beredskab Fyn I/S, Nordsjællands Brandvæsen, Beredskab 4K I/S og Vejle Kommune

    SSV complained that a group of fire and rescue services and municipalities, in a competitive procedure with negotiation for the construction and supply of fire engines, had not selected SSV to submit a tender but had selected candidates that, in SSV's view, did not meet the minimum requirements or were linked to each other. The Complaints Board found that the selection was within the contracting authorities' discretion and based on objective and non-discriminatory criteria under section 145, that the contract notice stated the means of proof as required by section 143, and that there were no plausible indications of an agreement aimed at distorting competition under section 137(1); the claim alleging a breach of competition law was dismissed.

  • Case 20/11681Not upheld

    Geelmuyden Kiese A/S v Aarhus Kommune

    Geelmuyden Kiese challenged Aarhus Kommune's award, under Part III of the Public Procurement Act, of a contract to operate the Internet Week Denmark festival, arguing among other things that the winner should have been excluded because a former project manager of the municipality had joined it, that a later modification of the contract was substantial, and that the evaluation was flawed. The Complaints Board found that all relevant information had been made available to all tenderers and no time advantage had materialised, cf. section 39(2)(i) and (ii), that relaxing the requirement of a separate CVR number was not a substantial modification under the principles of section 178, that the winner could tender as a group of economic operators under section 139(2), and that the evaluation was within the municipality's discretion.

  • Case 20/10131Not upheld

    MED-EL Nordic AB v Region Hovedstaden

    MED-EL complained that Region Hovedstaden's call-offs under a parallel framework agreement for cochlear implants with a ranked cascade model had been made contrary to the terms of the framework agreement and without reasons. The Complaints Board found that the region had used the framework agreement in accordance with its terms, since each call-off involved a medical assessment, and that the written-report requirement in section 174(1) does not apply to contracts awarded without reopening of competition under the framework agreement, cf. section 174(2).

  • Case 20/06930Not upheld

    Urbaser A/S v Silkeborg Genbrug og Affald A/S

    The complaint concerned Silkeborg Genbrug og Affald A/S's cancellation of a waste collection procurement and its earlier award to a tenderer that the complainant alleged had coordinated its tender with another tenderer. The Complaints Board found the cancellation objectively justified by a new political climate agreement, and that at the time of the award there were no such plausible indications of collusion that the contracting authority had to disregard the tenders or investigate further under section 159(3).

  • Case 21/00808Upheld

    Systematic A/S v Greve Kommune, Holbæk Kommune, Ringsted Kommune, Køge Kommune, Vordingborg Kommune, Kalundborg Kommune, Roskilde Kommune, Næstved Kommune, Guldborgsund Kommune, Lejre Kommune og Slagelse Kommune

    Systematic challenged a mini-competition held by 11 municipalities under SKI's framework agreement for software as a service for a joint IT system for social, health and care services, which KMD won. The Complaints Board found that the municipalities had breached section 100 by evaluating against functional use cases that in effect operated as new requirements not laid down in advance in the framework agreement's procurement documents, that their answers on the role of the use cases were unclear and contradictory, and that the evaluation method for the sub-criterion «Test» did not ensure a uniform evaluation, contrary to section 2; the mini-competition was annulled.

  • Case 20/05684Not upheld

    Per Aarsleff A/S v Assens Rensning A/S

    Per Aarsleff challenged Assens Rensning's award of a design-and-build contract for a new wastewater treatment plant to a consortium, and the evaluation of operating and maintenance costs. The Complaints Board found that the parent company's co-signature of the tender as a supporting entity was not a change in the composition of the consortium contrary to section 147(2), that Per Aarsleff bore the risk of having calculated its operating costs on assumptions not supported by the procurement documents, and that the contracting authority could not have let Per Aarsleff clarify its tender under section 159(5) without breaching section 2.

  • Case 20/08288Not upheld

    Peak Consulting Group A/S v Skatteministeriet v/Udviklings- og Forenklingsstyrelsen

    Peak Consulting challenged the Ministry of Taxation's award of a framework agreement for business and analysis services to, among others, Maximize Consult, which relied on several supporting entities, and the evaluation of tenders. The Complaints Board found that the ministry had no reason to examine whether the support arrangement was an unlawful anti-competitive agreement and no duty of effective verification under sections 159(3) and 164(2), since a tenderer may rely on the capacities of other entities under section 144(1), and that the evaluation and the evaluation method complied with section 160 and section 2.

  • Case 19/07906Partly upheld

    Remondis A/S v Silkeborg Genbrug og Affald A/S

    Remondis complained that Silkeborg Genbrug og Affald had awarded HCS a temporary waste collection contract without a procurement procedure after Remondis had terminated its contract and two procurements had been cancelled because of errors. The Complaints Board found that SGA had not proved that the conditions for extreme urgency in section 80(5) were met, since it had had enough time to carry out a lawful procedure, so it had breached sections 2 and 6; the award decision was annulled, but the contract was maintained for overriding reasons of general interest.